New Culvert/Berm on Frankenstein

On Canada Day the Frankenstein got a new exciting berm. With it the old persistent front-wheel-catching mud hole is gone; making the down swooping left turn much smoother/faster.  The water collecting problem is solved with a channel and a culvert. The full appreciation of the improvement will only be possible after some rain solidifies the disturbed dusty soil.

This entry was posted in Home. Bookmark the permalink.

Leave a Reply