Double R Steel

Last Fall’s trail work was mostly about filling in mud holes with gravel. Then the season got wrapped up with some major rerouting of trails through a swampy area, which required much gravel. The 2014 season will start with projects that will need even more gravel.

All that gravel came formĀ Scott Kalbfleisch and the good people from Double R Steel. On top of donating the gravel, Scott has been going into awful lot of trouble to deliver and dump the gravel onto stashes all over the trail system.

Scott’s Double R Steel Truck can often be noticed at one of the Hydrocut’s parking lots. This means Scott is out riding or working on the trails. It is too bad that most people will not notice all his work, cause the result is simply a nicer and dryer trail surface, without anything unusual to be noticed.

This entry was posted in Archive, Friends of The Hydrocut. Bookmark the permalink.

Leave a Reply